ADM Architects

Angelo Di Martino and a boutique practice, since 1999

ADM Architects is a registered architectural practice in Kembla Street, Wollongong, run by its founder.

Call +61 2 4228 6400Enquire

Patterned face brickwork in the podium of Infinity, Queens Parade, Wollongong
Brickwork in the podium of Infinity, 10 Queens Parade (2025).

Company overview

Angelo Di Martino, the sole director of the firm, is a registered architect on the NSW Architects Registration Board (No. 7608). He completed his degree in architecture at the University of Technology Sydney in 1995, graduating with honours, and established a small architectural practice in 1999, now known as ADM Architects.

The practice employs a mix of qualified and skilled people: registered architects, technical drafts people, graphics and an administration assistant.

The “ADM” philosophy

ADM puts its success down to remaining a boutique practice that offers a personal and professional architectural service. The director remains involved throughout the delivery of each project, so that his direction adds value at the design, documentation and construction stages.

“Good design is based on identifying appropriate and cost effective solutions within the project brief.”

The firm’s reputation, in its own words, rests on the quality of its service and the success of the buildings it delivers. ADM Architects is a registered architectural practice and is bound by the standards set out in the Architects Act 2003.

Registrations

Registration numbers as the practice publishes them. Each can be checked with the relevant board.

Nominated Architect
Angelo Di Martino, B.Arch (Hons) AIA
NSW Architects Registration Board
No. 7608
Queensland
No. 5604
Tasmania
No. 1629
NSW Design Practitioner
DEP 0000547

The work, by year

  1. 1995 Angelo graduates in architecture from UTS with honours.
  2. 1999 The practice is established.
  3. 2020 IMB Bank Wollongong and Southbank completed.
  4. 2022 Langs Corner Office Building completed.
  5. 2024 Colden Drive, Albion Park Rail, completed.
  6. 2025 Smith Street, Infinity, Civic and Northsea completed.
  7. 2026 Montague Street, North Wollongong, completed in March. The Globe under construction on Crown Street.

Only projects with a published completion date are listed. See all thirty-one projects

CallEnquire